Safety door Långö RC2
Choose Wood Type
Choose Glass Type
Choose Size
+0.00 kr
Choose Hinge
+0.00 kr
- LEFT
- RIGHT
Choose Kickplate
Choose Sidelight
Additional Options
Choose Door Open
+0.00
- OUTWARD
- INWARD
Choose Frame Extension
+0.00
- NO
- YES
Packages
Make Your Own Package
What does the RC2 classification mean?
The panels are screwed with a longer screw than standard, which makes it difficult to break the panels. The door also has reinforcements at the hinges and the strike plate. Doors tested for 15 minutes, with a total effective attack time of at least three minutes. In tests, screwdrivers, smaller hammers, pliers and wedges are used. This class includes villa doors that are meant to make it more difficult and delay an intrusion.
Do you need help choosing or customizing your security door? Feel free to contact us and we will help you with a proposal for your needs.
Panels | Solid wood planed in one piece, screwed with extra long stainless A2 screws, it’s not plywood or board |
Inside | The front door has an inside of veneer. |
Frame | Solid, that is, with the same type of wood straight through. Steel reinforcement plates at hinges and strike plate. |
Frame dim. | 52x92 mm |
Sealing strip | Silicone sealing strip in the door leaf |
Frame screws | The frame has pre-mounted frame screws |
Threshold | Solid hardwood with aluminium tread rail |
Hinges | Assa 3288, adjustable and with a safety catch. |
Lock case | Assa 2002 Connect, approved by the insurance companies in security class 3. With home & away security function. Protective cover at strike plate. |
Surface treatment Teak & Freijo | 2 layers of transparent teak oil |
Surface treatment Oak | 1 layer of Osmo Oak and 1 layer of Osmo transparent UV protection oil |
Extension jambs | Frame milled for extension jambs |
Lock case
Safety class RC2 marking
Assembly instructions
Maintenance instructions
A small bottle of oil for continued maintenance
Note! Not included:
Mounting of door
Order and order confirmation:
When you have ordered front doors, we will send you an order confirmation, terms and conditions of purchase and maintenance instructions via e-mail. Please read the documents carefully.
Approval of drawing & order: Along with the order confirmation, we send you a drawing for approval. When you have approved the drawing (might need adjustments) by signing, your door is submitted for production. The signature also applies as acceptance of our order confirmation as well as our terms of purchase conditions, so please read these documents carefully as well. Please note that the approval of the drawing determines the delivery time.
Payment: Payment in the webshop is made easily via SVEA-economy’s payment solution.
If you choose to call or email your order instead, you will receive an invoice. Well in time of delivery, we will email you an advance invoice and we have the payment, the door will be sent by carrier to the desired delivery address. Delivery date refers to the day when the goods are planned to leave the factory.
Delivery: We ship our doors with a carrier appointed by us. They call you before delivery so they know for sure that someone can receive the goods. Keep in mind that the drivers leave the goods at the plot boundary. Carrying the doors inside, putting them in a garage or truck unloading, etc. is not included in their tasks.
For deliveries to Norway: We contact our agent for customs clearance and VAT handling. Your payment of Norwegian VAT takes place via our agent and determines the delivery date from the factory.